REFERENCES

28. November 2024

GKI Power Plant Tyrol (Austria)

High-pressure water mist to protect two 89 MW transformers in the storage power plant with more than 15 tons of oil each

Customer: Tiroler Wasserkraft AG

Project description:

  • Avoidance of fire flashover to nearby power plant components
  • Central pump unit with 136l/min water flow and 5m³ reservoir for 30 min continuous spraying time
  • Installation and project management by AQUASYS
<< back to all references
crosschevron-down