AQUASYS high-pressure water mist system to protect production halls of a large austrian manufacturer of dental products.
Project Management: AQUASYS
Project description:
- Protection of 5000m² production area, associated social rooms and a 206m long collector corridor
- Design as wet system for room heights up to 8m
- Future extensions of the pipeline are possible at any time at predefined positions
- Installation, project management, training and commissioning by AQUASYS