Water mist protection for a central inner-city tunnel connecting to the industrial zone of Linz.
Customer: ELIN GmbH & Co KG
Project description:
Protection of the driving area of the 800 m long tunnel
Tunnel course below the track connections of the Westbahn and tramway
Increased safety for 22,000 vehicles per day